Teaching Block - Shuttleworth
Posted on 12th February 2024 at 12:00
Site: Kingshill Farm Teaching Block
Location: Old Warden, Biggleswade
Type of Works: New Build/Educational
Duration: 12 Weeks
Electrical Value: £100K
ECO2LEC carried out the full mechanical & electrical design and installation of a teaching block consisting of three classrooms, common room, staff room, toilets, changing rooms and locker room via our in house and sub-contract team
LV Electrical Distribution
Intelligent LED Lighting Complete With Presence/Absence Control, Switch Control & Daylight Dimming
External Lighting
USB Perimeter Part M Socket Outlets
Mechanical supplies
Cat L1 Fire Alarm Installation
Accessible Toilet Alarm
Intelligent Heating System
Door Access / Intercom
CCTV
15.99 kWp Solaredge Photovoltaic System
Heat Recovery Ventilation
Airconditioning Systems