MCE, Rushden - LED Lighting Upgrade
Posted on 3rd October 2019 at 12:00
Site: MCE Sapphire House Crown Way, Lighting Upgrade
Location: Rushden, Northamptonshire
Type of Works: LED Lighting Upgrade
Duration: 3 Weeks
Electrical Value: £25K
ECO2LEC carried out the LED lighting upgrade of the entirety of first floor of Sapphire House to which MCE reside. To limit disruption to operations the works were carried out during the night. All areas upgraded including the toilet blocks, reception, breakout area and meeting rooms.
Share this post: