Management Building - Daventry
Posted on 2nd December 2021 at 12:00
Site: Management Building
Location: Daventry, Northamptonshire
Type of Works: New Build/Base Build Fit-Out
Duration: 16 Weeks
Electrical Value: £200k
ECO2LEC carried out the full electrical design and installation of a management building in Daventry which consisted of:
LV incoming supply tails from a client supplied transformer to our LV panel designed to supply the entire site.
Full building power distribution, split metered lighting, power, mechanical and external lighting.
Containment systems throughout ceiling voids and within accessible floors.
Small power and data infrastructure installation via power track busbars and floor boxes.
Intelligent lighting with presence/absence detection as well as daylight dimming.
Life safety systems such as fire alarm, disabled refuge and accessible toilet alarms all designed, installed and commissioned.
Specialist supplies for rail de-railers and traversers as well as controls for penstock valves and petrol interceptors.
LV Electrical Distribution
Intelligent LED Lighting Complete With Daylight Dimming
Emergency Lighting
External Lighting
Car Park Lighting
Office 'Plug-in' Floor Box Small Power
Mechanical supplies
Cat L1 Fire Alarm Installation
Disabled Refuge
Accessible Toilet Alarms
Specialist Supplies
Control Wiring