Lloyds Avenue, Central London - Office Refurbishment
Posted on 14th June 2018 at 08:55
Site: 6 Lloyds Avenue Fenchurch Street, Office Refurbishment
Location: City Of London, Central London
Type of Works: Commercial/Refurbishment
Duration: 28 Weeks
Electrical Value: £300K
ECO2LEC LTD were tasked with the strip-out and reinstatement of fifteen office units in central London. Over a span of 28 weeks the units were stripped to a bare shell and exposed containment systems installed to the ceilings to give an industrial touch. Lighting design carried out in house, the LED suspended panels offer a uniform finish throughout the units. Each office also contained a kitchenette with electric water heater.
Full office refurbishments including; small power, lighting, data and fire alarm.
All the works were carried out within a functioning office block with minimal disruption to existing tenants.
LED Transparent Fittings
Brushed Satin Accessories Throughout
Galvanised Containment Systems
Fire Alarm Modifications
Data Installation
Mechanical Supplies