Site: GBS, Mezzanine Fit-Out
Location: Grantham, Lincolnshire
Type of Works: Industrial/Fit-Out
Duration: 3 Weeks
Electrical Value: £50K
A new high bay lighting installation using Zucchini lighting bus bar and 64 high bay 3 x 49W T5 fluorescent HF PIR controlled fittings, suspended by Gripple wire to suit the layout of new storage racking to be installed.
Share this post: