Europa Studios, North-West London - LED Lighting Upgrade
Posted on 14th December 2016 at 12:00
Site: Europa Studios, Lighting Upgrade
Location: Park Royal, North-West London
Type of Works: LED Lighting Upgrade
Duration: 6 Weeks
Electrical Value: £25K
ECO2LEC carried out the LED lighting upgrade of all corridor lighting replacing twin PL fittings for LED panels, reception lighting replacing fluorescent fittings for LED strip, toilet lighting, hand dryers, extract fans and external lighting.
Tagged as: Commercial, LED Lighting Upgrade
Share this post: