Deal Farm, Cambridge - Mixed Use New Build
Posted on 28th February 2020 at 12:00
Site: Deal Farm Mixed Use New Build
Location: Sawston, Cambridge
Type of Works: Mixed Use/New Build
Duration: 9 Weeks
Electrical Value: £100K
ECO2LEC were asked to design and carry out a full electrical installation Units 1&2 of Deal Farm with the lack of gas on site this also included electrical heating and ventilation was also picked up. Services supplied;
Lighting to the core areas, warehouse area (utilising busbar to aid in flexibility) & externally, small power throughout, heating to the core areas and warehouse, ventilation to the toilets and kitchenette, disabled toilet alarms & fire alarm system throughout.
Distribution
LED Lighting Throughout
Small Power
Door Supplies
Warehouse & Office Electric Heating
Ventilation
Fire Alarm Installation
Accessible Toilet Alarms
Share this post: