Site: CML 3, Mezzanine Fit-Out 
Location: Magna Park, Lutterworth 
Type of Works: Industrial/Fit-Out 
Duration: 10 Weeks 
Electrical Value: £200K 
Phase 1 consisted of relocating the existing and the installation of additional high bay lighting to suit the new racking layouts. Phase 2 consisted of the full electrical fit out of a picking mezzanine over 3 floors. The installation included 700 LED vapour proof light fittings installed upon over 2KM of Zucchini Lighting Busbar, small power & data, conveyor supplies & control wiring, emergency lighting and fire detection all delivered on time and within budget. 
 
 
 
Over 700 PIR Controlled LED Lights 
Over 2 KM Lighting Busbar Installed 
Fire Alarm Installation 
Data Installation 
Machine Supplies 
All carried out without disruption to operations! 
 