BPW, Leicester - Mezzanine Fit-Out
Posted on 19th February 2020 at 12:00
Site: BPW, Mezzanine Fit-Out
Location: Centurion Way, Leicester
Type of Works: Industrial/Fit-Out
Duration: 10 Weeks
Electrical Value: £40K
ECO2LEC were requested to carry out the electrical element of works carried out at BPW Leicester. The works consisted of; refurbishment of breakout room, toilets and shower room, introduction of a new mezzanine and the associated lighting and fire alarm works. An office and meeting room were constructed on the top deck of the mezzanine with small power, data & presentation requirements. Along side these works an existing racking system was removed and replaced, the associated lighting was replaced to suit the new layout .
Racking Specific LED Lighting
Office & Open Area LED Lighting
Fire Alarm Installation
Data Installation
Mechanical Supplies
All carried out within a functioning warehouse with minimal disruption to operations