POWERING YOUR FUTURE  
E: info@e2g.co.uk 
T: 01604 866 232 
Site: Units 1, 2, 3 & 5 Derby Industrial Estate 
Location: Derby, Derbyshire 
Type of Works: New Build/Base Build Fit-Out 
Duration: 28 Weeks 
Electrical Value: £1.4M 
ECO2LEC carried out the full electrical design and installation of four prospective build warehouse units. 
Each unit consisted of:  
Ground Floor: Reception With Feature Wall Lighting, Kitchenette And Accessible Shower Room/Toilet. 
First Floor: Open Area Office Space, Breakout Space With Kitchenette, Meeting Room, Circulation Area, Toilet Block, Cleaners Store And Accessible Toilet (Unit 5 Complete With Carbon Copy Second Floor). 
ECO2LEC installed the following services; 
HV electrical installation. Internal intelligent Bluetooth controlled LED lighting with daylight dimming throughout the office areas, meeting rooms, breakout spaces and receptions with occupancy sensored fittings to the toilets and circulation spaces. 
Small power installations in the form of floor boxes throughout the office areas. 
L1 fire detection systems to the offices and warehouses. 
Disabled refuge systems. 
Emergency lighting provisions to the warehouses. 
Dock leveller supplies. 
Building mounted external lighting covering the full perimeter of the buildings. 
Loading yard & car park lighting. 
EV Chargers across the site. 
PV systems to each of the buildings. 
 
HV Electrical Installation 
LV Electrical Distribution 
Intelligent Bluetooth LED Lighting Complete With Daylight Dimming 
Warehouse Emergency Lighting 
Perimeter External Lighting 
Loading Bay Lighting 
Loading Yard Lighting 
Car Park Lighting 
Estate Road Street Lighting 
Office 'Plug-in' Floor Box Small Power 
Mechanical supplies 
Dock Leveller Supplies 
Cat L1 Fire Alarm Installation (Office, Core & Warehouse) 
Disabled Refuge 
Accessible Toilet Alarms 
27 Dual Electric Vehicle Charging Pedestals Complete With Load Management 
27/20/39/60 kWp Photovoltaic Systems 
Share this post:

Leave a comment: