3 Warehouse Units, Tamworth - New Build Full Site
Posted on 1st April 2021 at 12:00
Site: Units 6-8 Tamworth Industrial Estate
Location: Tamworth, Staffordshire
Type of Works: New Build/Base Build Fit-Out
Duration: 16 Weeks
Electrical Value: £610K
ECO2LEC carried out the full electrical design and installation of three prospective build warehouse units.
Each unit consisted of:
Ground Floor: Reception, Accessible Shower Room/Toilet, Toilet & Store.
First Floor: Circulation Area, Male Toilet, Female Toilet, Cleaners Store, Meeting Room & Open Area Office Complete With Kitchenette.
ECO2LEC installed the following services;
Internal intelligent Bluetooth controlled LED lighting with daylight dimming throughout the office areas with occupancy sensored fittings to the toilets and circulation spaces.
Small power installations in the form of floor boxes throughout the office areas.
L1 fire detection systems to the offices and warehouses.
Disabled refuge systems.
Emergency lighting provisions to the warehouses.
Dock leveller supplies.
Building mounted external lighting covering the full perimeter of the buildings.
Loading yard & car park lighting.
EV Chargers across the site.
PV systems to each of the buildings.
Distribution
Intelligent Bluetooth LED Lighting Complete With Daylight Dimming
Warehouse Emergency Lighting
Perimeter External Lighting
Loading Bay Lighting
Loading Yard Lighting
Car Park Lighting
Service/Access Road Street Lighting
Office 'Plug-in' Floor Box Small Power
Mechanical supplies
Dock Leveller Supplies
Cat L1 Fire Alarm Installation (Office, Core & Warehouse)
Disabled Refuge
Accessible Toilet Alarms
Electric Vehicle Charging Complete With Load Management
35/25/25 kWp Photovoltaic Systems