POWERING YOUR FUTURE  
E: info@e2g.co.uk 
T: 01604 866 232 
Site: Units 6-8 Tamworth Industrial Estate 
Location: Tamworth, Staffordshire 
Type of Works: New Build/Base Build Fit-Out 
Duration: 16 Weeks 
Electrical Value: £610K 
ECO2LEC carried out the full electrical design and installation of three prospective build warehouse units. 
Each unit consisted of:  
Ground Floor: Reception, Accessible Shower Room/Toilet, Toilet & Store. 
First Floor: Circulation Area, Male Toilet, Female Toilet, Cleaners Store, Meeting Room & Open Area Office Complete With Kitchenette. 
ECO2LEC installed the following services;  
Internal intelligent Bluetooth controlled LED lighting with daylight dimming throughout the office areas with occupancy sensored fittings to the toilets and circulation spaces. 
Small power installations in the form of floor boxes throughout the office areas. 
L1 fire detection systems to the offices and warehouses. 
Disabled refuge systems. 
Emergency lighting provisions to the warehouses. 
Dock leveller supplies. 
Building mounted external lighting covering the full perimeter of the buildings. 
Loading yard & car park lighting. 
EV Chargers across the site. 
PV systems to each of the buildings. 
 
 
 
 
Distribution 
Intelligent Bluetooth LED Lighting Complete With Daylight Dimming 
Warehouse Emergency Lighting 
Perimeter External Lighting 
Loading Bay Lighting 
Loading Yard Lighting 
Car Park Lighting 
Service/Access Road Street Lighting 
Office 'Plug-in' Floor Box Small Power 
Mechanical supplies 
Dock Leveller Supplies 
Cat L1 Fire Alarm Installation (Office, Core & Warehouse) 
Disabled Refuge 
Accessible Toilet Alarms 
Electric Vehicle Charging Complete With Load Management 
35/25/25 kWp Photovoltaic Systems 
 
 
Share this post:

Leave a comment: 

Our site uses cookies. For more information, see our cookie policy. Accept cookies and close
Reject cookies Manage settings