POWERING YOUR FUTURE  
E: info@e2g.co.uk 
T: 01604 866 232 
Site: Units 1-3 Quedgeley Industrial Estate 
Location: Quedgeley, Gloucester 
Type of Works: New Build/Base Build Fit-Out 
Duration: 20 Weeks 
Electrical Value: £500K 
ECO2LEC carried out the full electrical design and installation of three prospective build warehouse units and service road. 
Each unit consisted of:  
Ground Floor: Reception, Accessible Shower Room & Toilet, Store. 
First Floor: Circulation Area, Male Toilet, Female Toilet, Cleaners Store, Meeting Room & Open Area Office Complete With Kitchenette. 
ECO2LEC installed the following services;  
Internal intelligent LED lighting with daylight dimming throughout the office/toilets/circulation spaces. 
Small power installations in the form of floor boxes throughout the office areas. 
L1 fire detection systems to the offices and manual coverage to warehouses. 
Disabled refuge systems. 
Emergency lighting provisions to the warehouses. 
Dock leveller supplies. 
Building mounted external lighting covering the full perimeter of the buildings. 
Loading yard & car park lighting. 
EV Chargers across the site. 
Service & access road street lighting. 
 
 
 
 
Distribution 
Intelligent LED Lighting Complete With Daylight Dimming 
Warehouse Emergency Lighting 
Perimeter External Lighting 
Loading Bay Lighting 
Loading Yard Lighting 
Car Park Lighting 
Service/Access Road Street Lighting 
Office 'Plug-in' Floor Box Small Power 
Mechanical supplies 
Dock Leveller Supplies 
Cat L1 Fire Alarm Installation (Office & Core) 
Cat M Fire Alarm Installation (Warehouse) 
Disabled Refuge 
Accessible Toilet Alarms 
Electric Vehicle Charging Complete With Load Management 
 
 
Share this post:

Leave a comment: